ROLAN CARPENTER Construction

25 Habersham Ct, Silver Spring, MD 20906
(301) 275-5438
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Washington

BUSINESS OVERVIEW

At Rolan Carpenter Construction, we are your premier choice for Home Improvements to include Kitchen, Bath and Basement Remodels, Interior Painting, Carpentry, Doors, Windows installed or repaired. We have provided high quality work and friendly customer service for years. Call today!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Silver Spring, MD:


Project: Remodel or Renovate One or More Rooms
Date: 12/01/2022
Nature of project: Remodel / update a few rooms
Rooms to be Remodeled: Kitchen, Bathroom(s), Other
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Location: Home/Residence
Comment: I would like to get an estimate for remodeling, please contact me via email to xxxxxxxxxxxxxxxxxx or text me, thanks.

Project: Renovate or Repair a Home
Date: 11/2022
Project Description: Other
Work included: Drywall, Painting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Plastering three areas and painting. I have the paint that was originally used.

Project: Build an Addition
Date: 11/2022
Project Description: Design and build
Type of Addition: Remodel existing space
Rooms Included:: Bathroom
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: Install a new shower in a half bathroom in the basement of a townhouse near the intersection of Georgia Ave. and Plyers Mill Road, Silver Spring, 20902. Will require: (1) cracking the basement floor to install drain pipe for the new shower; (2) remodeling the space shared by the existing half bathroom and the adjacent laundry room; and (3) installing a new interior door. The basement has an outside entrance.

Project: Renovate or Repair a Home
Date: 11/2022
Project Description: Major home repair project
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

Project: Remodel a Basement
Date: 11/2022
Basement Features: Other
Design Preparation: None
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Comment: I am looking to renovate into a small living space for mom. Buntlines flooring. Sheetrock repair. Small Kitchenette needs to be added my budget is low.

Project: Remodel a Kitchen
Date: 11/2022
Lighting: No - I do not plan to update the lighting
Flooring: Yes - I plan to update the flooring
Cabinets: No - I do not plan to move or update the cabinets
Floorplan: I am considering changes to kitchen floorplan
Sinks: No - I do not plan to update the sinks
Countertops: No - I do not plan to update the countertops
Appliances: No - I do not plan to move or update the appliances
Request Stage: Planning & Budgeting
Property Owner: Yes
Historical Work: No
Desired Completion Date: Timing is flexible
Covered by Insurance: No
Location: Home/Residence
Have you already purchased the flooring for this project?: Yes
What type of flooring would you like installed?: Vinyl or linoleum
Comment: 79.5x66.5 in

Project: Remodel a Kitchen
Date: 11/2022
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Location: Home/Residence

Project: Remodel a Bathroom
Date: 11/2022
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Which of the following will you need moved or installed in your bathroom remodel (select all that apply)?: Shower / Bath, Sinks, Flooring, Toilet
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

Project: Remodel a Kitchen
Date: 11/2022
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Location: Home/Residence

Project: Remodel or Renovate One or More Rooms
Date: 11/2022
Rooms to be Remodeled: Other
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Location: Home/Residence
Comment: Entry door repair