CES Building Group, Inc.

5932 Hugh Howell, Stone Mountain, GA 30087
(770) 413-8100
4.0 | 1 Verified Ratings
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Atlanta

BUSINESS OVERVIEW

Excellent service by Design Build method. We are a Design-Build General Contractor and Remodeler.

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Ratings & Reviews

CES Building Group, Inc.
Showing 1-1 of 1
Page 1 of 1
Sort by newest   Date ▼   Rating  
4.0   |  
Review by in Atlanta, GA
The job took several days more than originally anticipated, but CES stuck with it, and spent time on the job every day until it was complete. The professionals who worked on the job were courteous and I was very pleased with the final result.
Was this review helpful?  
Showing 1-1 of 1
Page 1 of 1

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Stone Mountain, GA:


Project: Renovate or Repair a Home
Date: 01/24/2022
Project Description: Major renovation
Request Stage: Ready to Hire
Customer moving in/out?: No
Desired Completion Date: Timing is flexible
Location: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: I would like to get an estimate for Renovate or Repair a Home

Project: Remodel a Kitchen
Date: 01/22/2022
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Location: Home/Residence
Comment: I would like a kitchen remodel

Project: Remodel a Bathroom
Date: 01/22/2022
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel a Garage
Date: 01/21/2022
Scope of Remodel: Completely remodel garage
Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving
Garage doors: No - I do not plan to update the garage doors
Insulation: Yes - I plan to add insulation
Flooring: Yes - I plan to update the flooring
Electrical: No - I do not plan to update the lighting or electrical fixtures
Interior walls or drywall: Yes - I plan to add or remove walls or drywall
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Location: Home/Residence

Project: Remodel a Basement
Date: 01/21/2022
Basement Features: Bathroom(s), Bedroom(s), Kitchen
Design Preparation: None
Basement Area Description: Unfinished
Square Footage: More than 800 (large)
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Location: Home/Residence

Project: Remodel a Bathroom
Date: 01/21/2022
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Customer moving in/out?: No
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Would like to know first the estimate. Please contact the customer to discuss the details of this project.

Project: Remodel a Bathroom
Date: 01/21/2022
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Customer moving in/out?: No
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

Project: Remodel a Kitchen
Date: 01/20/2022
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Location: Home/Residence

Project: Remodel a Basement
Location: Smoke Rise, GA
Date: 01/20/2022
Basement Features: Bathroom(s), Bedroom(s), Exercise Area, Separate Apartment, Game Room, Stairway, Home Theater, Kitchen
Design Preparation: Sketches or basic idea of project
Basement Area Description: Unfinished
Square Footage: More than 800 (large)
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Location: Home/Residence
Property Owner: Yes
Historical Work: Yes
Covered by Insurance: Yes
Comment: Unfished basement. All interior walls are framed. Exterior walls need to be framed.

Project: Remodel a Bathroom
Date: 01/19/2022
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible